Skid Placement
Site preparation recommendations:
• 4” to 6” of 3/4” modified stone base
• Level stone evenly
• Stone base should be made 12” wider and 12” longer than normal shed size
• Check with local authorities about building permits
Site preparation recommendations:
• 4” to 6” of 3/4” modified stone base
• Level stone evenly
• Stone base should be made 12” wider and 12” longer than normal shed size
• Check with local authorities about building permits